But I’m tired. Spackling the holes drilled and plugged by the insulation guys was exhausting. And I’ve got 2/3rds of the project left.
Tomorrow I have to sand all the holes, including about 2 dozen that are 12 feet up the walls, and then Sunday I have to prime all the plugs for painting at some point in the future. But at least they will all be air and water tight and not too unsightly.
